In Neville v Wilson [1996] 3 All ER 171, CA held that [...], despite the absence of writing required by s53(1)(c) LPA 1925. The making of a specifically enforceable contract creates a constructive trust in favour of the transferee, so the s 53(2 exception for ‘the creation and operation of resulting or constructive trusts’ applies and dispenses with the requirement for writing under s53(1)(c).
Answer
a contract for valuable consideration to assign an equitable interest in shares in a private company operated to transfer the interest
Tags
#equity #formalities #law
Question
In Neville v Wilson [1996] 3 All ER 171, CA held that [...], despite the absence of writing required by s53(1)(c) LPA 1925. The making of a specifically enforceable contract creates a constructive trust in favour of the transferee, so the s 53(2 exception for ‘the creation and operation of resulting or constructive trusts’ applies and dispenses with the requirement for writing under s53(1)(c).
Answer
?
Tags
#equity #formalities #law
Question
In Neville v Wilson [1996] 3 All ER 171, CA held that [...], despite the absence of writing required by s53(1)(c) LPA 1925. The making of a specifically enforceable contract creates a constructive trust in favour of the transferee, so the s 53(2 exception for ‘the creation and operation of resulting or constructive trusts’ applies and dispenses with the requirement for writing under s53(1)(c).
Answer
a contract for valuable consideration to assign an equitable interest in shares in a private company operated to transfer the interest
If you want to change selection, open original toplevel document below and click on "Move attachment"
Parent (intermediate) annotation
Open it In Neville v Wilson [1996] 3 All ER 171, CA held that a contract for valuable consideration to assign an equitable interest in shares in a private company operated to transfer the interest, despite the absence of writing required by s53(1)(c) LPA 1925. The making of a specifically enforceable contract creates a constructive trust in favour of the transferee, so the s 5
Original toplevel document (pdf)
cannot see any pdfs
Summary
status
not learned
measured difficulty
37% [default]
last interval [days]
repetition number in this series
0
memorised on
scheduled repetition
scheduled repetition interval
last repetition or drill
Details
No repetitions
Discussion
Do you want to join discussion? Click here to log in or create user.