l = Total operator loading and unloading time per machine
m = Total machine running time
Answer
Number of machines
Question
n = (l+m) / l
where:
n = [...] the operator is assigned
l = Total operator loading and unloading time per machine
m = Total machine running time
Answer
?
Question
n = (l+m) / l
where:
n = [...] the operator is assigned
l = Total operator loading and unloading time per machine
m = Total machine running time
Answer
Number of machines
If you want to change selection, open original toplevel document below and click on "Move attachment"
Parent (intermediate) annotation
Open it n = (l+m) / l where: n = Number of machines the operator is assigned l = Total operator loading and unloading time per machine m = Total machine running time
Original toplevel document (pdf)
owner: orantisiz - (no access) - 4-activity_charts-23.pdf, p5
Summary
status
not learned
measured difficulty
37% [default]
last interval [days]
repetition number in this series
0
memorised on
scheduled repetition
scheduled repetition interval
last repetition or drill
Details
No repetitions
Discussion
Do you want to join discussion? Click here to log in or create user.