n = (l+m) / l
where:
n = Number of machines the operator is assigned
l = Total operator [...] time per machine
m = Total machine running time
n = (l+m) / l
where:
n = Number of machines the operator is assigned
l = Total operator [...] time per machine
m = Total machine running time
n = (l+m) / l
where:
n = Number of machines the operator is assigned
l = Total operator [...] time per machine
m = Total machine running time
status | not learned | measured difficulty | 37% [default] | last interval [days] | |||
---|---|---|---|---|---|---|---|
repetition number in this series | 0 | memorised on | scheduled repetition | ||||
scheduled repetition interval | last repetition or drill |