Do you want BuboFlash to help you learning these things? Or do you want to add or correct something? Click here to log in or create user.



Tags
#cfa #cfa-level-1 #economics #reading-15-demand-and-supply-analysis-the-firm #section-3-analysis-of-revenue-costs-and-profit
Question
Average total cost is often referenced as [...] and is frequently called [...].
Answer
per-unit cost

average cost

Tags
#cfa #cfa-level-1 #economics #reading-15-demand-and-supply-analysis-the-firm #section-3-analysis-of-revenue-costs-and-profit
Question
Average total cost is often referenced as [...] and is frequently called [...].
Answer
?

Tags
#cfa #cfa-level-1 #economics #reading-15-demand-and-supply-analysis-the-firm #section-3-analysis-of-revenue-costs-and-profit
Question
Average total cost is often referenced as [...] and is frequently called [...].
Answer
per-unit cost

average cost
If you want to change selection, open original toplevel document below and click on "Move attachment"

Parent (intermediate) annotation

Open it
Average total cost is often referenced as per-unit cost and is frequently called average cost. The minimum point on the average total cost curve defines the output level that has the least cost. The cost-minimizing behavior of the firm would

Original toplevel document

Open it
cost. However, the minimum point on the AVC does not correspond to the least-cost quantity for average total cost. In Exhibit 13, average variable cost is minimized at 2 units, whereas average total cost is the lowest at 3 units. <span>Average total cost (ATC) is calculated by dividing total costs by quantity or by summing average fixed cost and average variable cost. For instance, in Exhibit 13, at 8 units ATC is 125 [calculated as (1,000 ÷ 8) or (AFC + AVC = 12.5 + 112.5)]. Average total cost is often referenced as per-unit cost and is frequently called average cost. The minimum point on the average total cost curve defines the output level that has the least cost. The cost-minimizing behavior of the firm would dictate operating at the minimum point on its ATC curve. However, the quantity that maximizes profit (such as Q 3 in Exhibit 17) may not correspond to the ATC-minimum point. The minimum point on the ATC curve is consistent with maximizing profit per-unit, but it is not necessarily consistent with maximizing total profit. In Exhibit 13, the least-cost point of production is 3 units; ATC is 75, derived as [(225 ÷ 3) or (33.3 + 41.7)]. Any other production level results in a higher ATC. Marginal cost (MC) is the change in total cost divided by the change in quantity. Marginal cost also can be calculated by taking the change in total variable cost and divi

Summary

statusnot learnedmeasured difficulty37% [default]last interval [days]               
repetition number in this series0memorised on               scheduled repetition               
scheduled repetition interval               last repetition or drill

Details

No repetitions


Discussion

Do you want to join discussion? Click here to log in or create user.