Do you want BuboFlash to help you learning these things? Or do you want to add or correct something? Click here to log in or create user.



#art-of-memory #linking-methods
Dobe is linked to base (an association made between them). Later you can use that base to recall the dobe.
If you want to change selection, open original toplevel document below and click on "Move attachment"

Parent (intermediate) annotation

Open it
al or nonvisual, e.g an abstract concept. If it is nonvisual then it is useful to first create a mnemonic image for the dobe. In MLS (and PLS) a random middle dobe of the chain is also base (you use it to recall the next dobe). <span>Dobe is linked to base (an association made between them). Later you can use that base to recall the dobe. <span><body><html>

Original toplevel document

r30's mnemonics
on? 3.5 3.5 Some exceptions 3.6 Inside vs next-to placement 4 4. Interaction Method 5 5. Link Systems 5.1 5.1 Mnemonic Link System 5.1.1 5.1.1 IM- or TM-based chain? 5.2 5.2 Pinned Link System 6 6. When to use which linking technique? <span>1. Used terminology „Base object“ or just „base“ – real object (or just image) that we already know. In linking techniques it is the first object in your link.Besides it being an "object", it may also be a person, or something general like room, wall, ground, etc. If it is an item from your Peg System, then we call it peg. In method of loci we call it locus (base has a position with respect to other objects). „Data object“ or just „dobe“– object that we want to memorize. It may be visual or nonvisual, e.g an abstract concept. If it is nonvisual then it is useful to first create a mnemonic image for the dobe (see How to Create Mnemonic Images). In MLS (and PLS) a random middle dobe of the chain is also base (you use it to recall the next dobe). Dobe is linked to base (an association made between them). Later you can use that base to recall the dobe. I took the liberty to classify different types of mnemonic linking techniques. The following two methods cover all the ways (that I can think of) to link dobe to base : Transformation m


Summary

statusnot read reprioritisations
last reprioritisation on suggested re-reading day
started reading on finished reading on

Details



Discussion

Do you want to join discussion? Click here to log in or create user.